The bridge will close for periods of up to 25 minutes at a time between 9 a.m. and 3 p.m. to allow a safety inspection, weather permitting. The rain date is Thursday, Dec. 19.
The safety inspection is part of a federal mandate that requires bridge inspections every two years by engineering firms hired by the New Jersey Department of Transportation.
http://www.shorenewstoday.com/snt/news/index.php/hamilton-twp/hamilton-twp-general-news/47651-lower-bank-road-bridge-traffic-advisory.html
No comments:
Post a Comment